Slim jean
A close leg that stays wearable — the safest first order in denim.
See it →Four blocks, one fabric story. Denim is the category Egypt does best.
Men's denim at a glance
| Style | Fit | How it is cut | HS code | FOB price |
|---|---|---|---|---|
| Slim jean | Slim | Slim leg, close through the thigh and knee | 6203.42 | From $15.00 |
| Straight jean | Straight | Five-pocket jean, straight leg | 6203.42 | From $15.00 |
| Relaxed jean | Relaxed | Roomier through the thigh, straight to the hem | 6203.42 | From $15.00 |
| Tapered jean | Tapered | Full at the top, narrow at the ankle | 6203.42 | From $15.00 |
You specify it; the mill sources it. This range is built on rigid cotton denim, cotton / elastane stretch denim.
Egyptian denim mills weave locally from yarn and finish in the same group. That is two production stages in one country — which is exactly what duty-free entry to Europe asks for.
Yes. The minimum is 50 pieces per style, per colour, on stock fabric, spread across your sizes, so a first run can be one style in one colour. You can start from a tech pack, or from a reference garment if you do not have a tech pack yet. Samples cost $20 per sample, which covers shipping it to you. Jeans start from $15.00 per piece, FOB; exact price per tech pack, fabric and quantity.
Yes, on stock fabric: 50 pieces per style, per colour, spread across your sizes, in indigo and black. Custom-dyed or printed fabric carries the mill's own, higher minimum, and we confirm it before quoting.
Yes. Send it as a reference garment with your notes on fit, fabric and what to change, and we tell you what is missing before we cost it. You do not need a tech pack to start, and nothing is cut before you approve the pre-production sample.
Yes, from the first 50 pieces: embroidered logo, woven label, printed care label, hangtags & swing tickets, custom hardware and branded packaging. The woven label also carries the composition text the EU requires.
First sample in 5–7 days, then the fit sample in 3–5 days and the pre-production sample in 5–7 days. Then 15–30 days from PP-sample approval to ex-factory, for orders up to 10,000 pieces. From an approved tech pack, the published stages add up to 28–49 days to ex-factory: proto, fit and pre-production samples, then fabric and production.
Yes. The trucker jacket in the outerwear range is made in the same denim and wash as the jeans, in indigo or black, so the jacket and the jean sell as a set. Each is its own style, with its own minimum of 50 pieces per colour.